Layout Update 8-16-15
This month we did a lot of work with the water end of Jersey City, and got the return loop deck installed.
Go back to
GSC Home
Go back to
GSC Layout Index
Index page 1
2
Click on a picture to enlarge it.
Laying out the dock and ship placement
Making sure there's enough room for the dumper's kick back track
The final placement
Checking the track clearances
Mike and Jules spot the dumper
Bob glues the bulkhead support to the water cut out
Ed and Bob nail the bulkhead to the water
Risers being leveled
Jules, Mike and Ed attach the water
Water in front of the dumper
35 ft. of water installed
Jules, Doug and Mike check the opening they cut for the ship
A piece of the old Asbury Park layout that originally held the ship
The car float and apron in their new home
Mike is happy with the way the ship and car float came out
Looking back towards the dumper
Index page 1
2
Click on a picture to enlarge it.
Saturday, August 15, 2015
Generated by
Galerie